Kelompok Keahlian | KK Sistem Manufaktur |
---|---|
Sekolah/Fakultas | Fakultas Teknologi Industri |
Jabatan Fungsional | LEKTOR KEPALA |
- S1
ITB, Bandung – Indonesia
1993
- S2
ITB, Bandung – Indonesia
1997
- S3
ITB, Bandung – Indonesia
2011
- Google Scholar
- h-index : 5
- i10-index : 4
- Scopus
- h-index : 4
- Sinta
- SINTA Score Overall : 318
- SINTA Score 3 Years : 98
-
ERP Post-implementation Management: optimizing system usage and learning (2016)
-
MODEL SISTEM USAHA UNTUK PENGEMBANGAN INDUSTRI KREATIF JAWA BARAT (2016)
-
Kolaborasi Tahap Rekayasa Manufaktur IKM (2015)
-
Model Aplikasi online Marketing untuk UMKM (2015)
-
Model Sistem Usaha Untuk Pengembangan Industri Kreatif Jawa Barat (2015)
-
Perancangan Risk Analysis Framework untuk Implementasi Open-ERP di UKM dengan memanfaatkan Generalized Reference Architecture and Methodology (GERAM) (2015)
-
Management Proyek, Dana Kas Operasional Kantor Pengembangan ITB - JICA (DIPA) (2014)
-
Model Sistem Usaha untuk Pengembangan Industri Kreatif Jawa Barat (2014)
-
Dana Operasional PIU ITB JICA (2012)
-
Seleksi Program Magister dan Doktor TMI (2012)
-
Dana Operasional Kegiatan Proyek Pengembangan ITB - JICA (2011)
-
Offshore IT Outsorcing to Indonesia: A Study on Strategic Objectives and Success Factors (2011)
-
Seleksi dan Matrikulasi untuk Program Studi Magister dan Doktor TMI-ITB Tahun Ajaran 2011/2012 (2011)
-
Penyusunan Tataran Transportasi Lokal Kabupaten Bandung Tahun Anggaran 2008 (2008)
-
Perencanaan Pembangunan Prasarana dan Fasilitas Perhubungan (2008)
- Assembly Sequence Optimization to Minimize Reorientation and Tool Changes Using Genetic Algorithm
William, Hasby, F.M., Aribowo, W., Sukoyo
Lecture Notes in Mechanical Engineering, 2023, pp. 51–57 (2023) - Best-Fit Heuristic Algorithm for Multi-stack Rectangular Packing Problem of NC Router Machine
Ali, I., Aribowo, W., Sukoyo
Lecture Notes in Mechanical Engineering, 2023, pp. 509–516 (2023) - A Batch Scheduling Model for a Three-Stage Flowshop with Batch Processor and Heterogeneous Job Processor to Minimize Total Actual Flowtime
Suryadhini, P.P., Sukoyo, Suprayogi, Halim, A.H.
Intelligent Engineering and Management for Industry 4.0, 2022, pp. 1–12 - W. Aribowo, I Ali, Sukoyo. "An optimization model of variable size two-dimensional nesting with stacked sheets and usable leftovers for the CNC routing process." Journal of Physics:Conference Series 1858 (1), 012043 (2021)
- Suryadhini, P.P., Sukoyo, S., Suprayogi, S., Halim, A.H. "A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time". (2021)
- An optimization model for coal procurement networks with coal blending facilities
Imaduddin, M., Sukoyo
Lecture Notes in Mechanical Engineeringthis link is disabled, 2020, pp. 326–334 (2020) - Normasari N.M.E., Yu V.F., Bachtiyar C., Sukoyo
A simulated annealing heuristic for the capacitated green vehicle routing problem(2019) - Yusriski R., Sukoyo, Samadhi T.M.A.A., Halim A.H.
An integer batch scheduling model considering learning, forgetting, and deterioration effects for a (2018) - Trusaji W., Akbar M., Sukoyo, Irianto D.
Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction(2018) - Siswanto J., Sukoyo, Razan A.
Business system requirement for small craft companies(2017) - Yusriski R., Sukoyo, Samadhi T.M.A.A., Halim A.H.
An Integer Batch Scheduling Model for a Single Machine with Simultaneous Learning and Deterioration (2016) - Yusriski R., Astuti B., Sukoyo, Samadhi T.M.A.A., Halim A.H.
Integer Batch Scheduling Problems for a Single-Machine to Minimize Total Actual Flow Time(2015) - Siswanto J., Suparman S., Sudirman I., Sukoyo, Andriani M.
Characteristics of business system requirement for creative industries SMEs in bandung(2014) - Kasmara A., Muraki M., Matsuoka S., Sukoyo, Suryadi K.
Production planning in remanufacturing/manufacturing production system(2001)
-