Kelompok Keahlian | KK Sistem Manufaktur |
---|---|
Sekolah/Fakultas | Fakultas Teknologi Industri |
Jabatan Fungsional | GURU BESAR |
- S1
ITB, Bandung – Indonesia
1981
- S2
ITB, Bandung – Indonesia
1985
- S3
The University of Queensland, Queensland – Australia
1993
- Google Scholar
- h-index : 15
- i10-index : 22
- Scopus
- h-index : 11
- Sinta
- SINTA Score Overall : 3.042
- SINTA Score 3 Years : 357
-
SISTEM PRODUK-JASA TERPADU (Integrated product-service system) (2021)
-
Layanan purna jual (garansi produk dan pemeliharaan) untuk industri 4.0 (2020)
-
SISTEM PRODUK-JASA TERPADU (Integrated product-service system) (2020)
- Layanan Purna Jual (Garansi Produk dan Pemeliharaan) Untuk Industri 4.0 (Sistem Produk-Jasa Terpadu (Integrated Product-Service System) (2019)
-
Model Kontrak Sewa (Lease Contract) Untuk Armada Alat Berat Pada Perusahaan Pertambangan (2019)
-
Model Layanan Purna Jual Untuk Alat Berat Remanufaktur (2019)
-
Seleksi mahasiswa sistem UTBK 2019 (2019)
-
Sistem Produk-Jasa Terpadu (Integrated Product-Service System) (2019)
-
KONTRAK PEMELIHARAAN ALAT BERAT MELIBATKAN TIGA PIHAK - PEMANUFAKTUR, AGEN DAN KONSUMEN DALAM SITUASI KOMPETITIF/KOOPERATIF (2018)
-
MODEL KONTRAK SEWA (LEASE CONTRACT) UNTUK ARMADA ALAT BERAT PADA PERUSAHAAN PERTAMBANGAN (2018)
-
MODEL LAYANAN PURNA JUAL UNTUK ALAT BERAT REMANUFAKTUR (2018)
-
KONTRAK PEMELIHARAAN ALAT BERAT MELIBATKAN TIGA PIHAK - PEMANUFAKTUR, AGEN DAN KONSUMEN DALAM SITUASI KOMPETITIF/KOOPERATIF (2017)
-
MODEL LAYANAN PURNA JUAL UNTUK ALAT BERAT REMANUFAKTUR (2017)
-
Kontrak pemeliharaan alat berat melibatkan tiga pihak -pemanufaktur, agen dan konsumen dalam situasi kompetisi/kooperasi (2016)
-
Kontrak Pemeliharaan Alat Berat Melibatkan Tiga Pihak Pemanufaktur, Agen dan Konsumen Dalam Situasi Kompetitif/Kooperatif (2016)
-
PEMODELAN KONTRAK PEMELIHARAAN TERINTERGRASI UNTUK ALAT BERAT DI PERTAMBANGAN (2016)
-
Indonesia Coast Guard Academy (ICGA) (2015)
-
Kontrak Pemeliharaan Armada Alat Berat Pada Industri Pertambangan ( Lanjutan) (2015)
-
Pemodelan Kontrak Pemeliharaan Terintegrasi Untuk Alat Berat di Pertambangan (2015)
-
Sosialisasi dan Promosi Seleksi Nasional Masuk Perguruan Tinggi Negeri Tahun 2015 (2015)
-
Kontrak Pemeliharaan Armada Alat Berat pada Industri Pertambangan (2014)
-
Kontrak Pemeliharaan Berbasis Performansi untuk Alat Berat (2014)
-
Management Proyek, Dana Kas Operasional Kantor Pengembangan ITB - JICA (DIPA) (2014)
-
Pemberian Bantuan Dana Riset Mobil Listrik Nasional (2014)
-
Pemodelan dan analisis kontrak pemeliharaan alat berat pada tambang terbuka batu bara dengan mempertimbangkan faktor beban/penggunaan dan waktu (perioda Kontrak) (2013)
-
Strategi perbaikan dan pemeliharaan pencegahan untuk meminimumkan ongkos garansi produk otomotif (2013)
-
Swakelola Analisa Rekomendasi Posisi Runding Dalam Bentuk Position Paper Mengenai Penyusunan Barang-Barang Lingkungan Indonesia (2013)
-
Technology deveopment for the biological production of dodecanedioic acid from the plantderived long-chain fatty acid (2013)
-
Keputusan Optimal untuk Kontrak Pemeliharaan Alat Berat yang Dipergunakan pada Industri Pertambangan (2012)
-
Pendekatan Terintegrasi untuk Pengurangan Ongkos Garansi (2011)
-
Dua Strategi Layanan Garansi Baru Untuk Produk Yang Dijual Dengan Garansi Satu Dimensi (2010)
- A Review on Real Driving Cycle-Based State of Charge Prediction for EV Batteries
I Romli, BP Iskandar4th Borobudur International Symposium on Science and Technology 2022(BIS-STE 2022) Halaman 453-459
- A Two-dimensional Maintenance Service Contract Considering Availability and Maintenance Cost.
NF Sa’idah, A Cakravastia, US Pasaribu, BP IskandarInternational Journal of Technology 14 (2) (2023)
- Warranty cost analysis for products protected by Lemon Laws
BP Iskandar, US Pasaribu, R Wangsaputra, A Cakravastia, H HusniahQuality Technology & Quantitative Management, 1-23 (2023)
- Warranty and maintenance service contracts for repairable products
BP Iskandar, NF Sa'idah, US Pasaribu, A Cakravastia, H HusniahAlexandria Engineering Journal 61 (12), 10819-10835 (2022)
- Cost Analysis for Two Dimensional Warranted Products Protected by Lemon Laws Considering Multi Component System
H Husniah, R Wangsaputra, US Pasaribu, BP Iskandar2021 5th International Conference on System Reliability and Safety (ICSRS … (2021)
- Husniah, H., Pasaribu, U.S., Iskandar, B.P., "Multi-period lease contract for remanufactured products". (2021)
- Husniah, H., Pasaribu, U.S., Wangsaputra, R., Iskandar, B.P."Condition-based maintenance policy for a leased reman product".(2021)
- A condition-based maintenance policy for a system deteriorating with age and usage
Lubis, D.C., Iskandar, B.P.
IOP Conference Series: Materials Science and Engineeringthis link is disabled, 2020, 1003(1), 012108 (2020) - Warranty cost analysis for a multi-component product protected by lemon laws
Husniah, H., Pasaribu, U.S., Iskandar, B.P.
IOP Conference Series: Materials Science and Engineeringthis link is disabled, 2020, 1003(1), 012110 (2020) - Multi-criteria spine layout design of a mixed production line considering additional processes required for a new product
Arifiyanto, A., Cakravastia, A.R.A., Priyatna Iskandar, B.
IOP Conference Series: Materials Science and Engineeringthis link is disabled, 2020, 1003(1), 012027 (2020) - Husniah H., Wangsaputra R., Iskandar B.P.
Cost analysis of lemon law warranties for used equipments(2020) - Husniah H., Supriatna A.K., Iskandar B.P.
Lease contracts with servicing strategy model for used product considering crisp and fuzzy usage rat(2020) - Game theoretic models in fleet performance-based maintenance contracts Husniah, H., Andriana,, Iskandar, B.P. International Journal of Business and Globalisation, 2020, 26(1-2), pp. 41–56
- Dump truck maintenance contract model considering operational conditions (Load, road inclination and environment condition)
Nishfi, F., Iskandar, B.P., Wangsaputra, R.
Lecture Notes in Mechanical Engineeringthis link is disabled, 2020, pp. 342–348 (2020) - Husniah H., Wangsaputra R., Iskandar B.P.
Cost analysis of lemon law warranties for used equipments(2020) - Husniah H., Supriatna A.K., Iskandar B.P.
Lease contracts with servicing strategy model for used product considering crisp and fuzzy usage rat(2020) - Game theoretic models in fleet performance-based maintenance contracts Husniah, H., Andriana,, Iskandar, B.P. International Journal of Business and Globalisation, 2020, 26(1-2), pp. 41–56
- Dump truck maintenance contract model considering operational conditions (Load, road inclination and environment condition)
Nishfi, F., Iskandar, B.P., Wangsaputra, R.
Lecture Notes in Mechanical Engineeringthis link is disabled, 2020, pp. 342–348 (2020) - Iskandar B.P., Husniah H."Condition-based maintenance policy for leased equipment considering usage rate"(2019)
- Husniah H., Wangsaputra R., Iskandar B.P.
Lease Contract with Availability Target and Price Discount(2019) - Sa\'Idah N.F., Cakravastia A., Pasaribu U.S., Iskandar B.P.
Optimal decision for two dimensional maintenance service contract involving three parties(2019) - Soemadi K., Iskandar B.P., Taroepratjeka H.
Optimal overhaulreplacement policy for a multi-degraded repairable system sold with warranty(2019) - Husniah H., Maulana H.A., Pasaribu U.S., Iskandar B.P.
Two-dimensional lease contract with preventive maintenance using bivariate weibull(2019) - Sa\'Idah N.F., Cakravastia A., Pasaribu U.S., Iskandar B.P.
Bi-level optimization for maintenance service contracts involving three parties using genetic algori(2018) - Husniah H., Wangsaputra R., Cakravastia A., Iskandar B.P.
Game-Theoretic Models for Usage-based Maintenance Contract(2018) - Husniah H., Pasaribu U.S., Iskandar B.P.
Lease contract in usage based remanufactured equipment service system(2018) - Iskandar B.P., Wangsaputra R., Pasaribu U.S., Husniah H.
Optimal Lease Contract for Remanufactured Equipment(2018) - Husniah H., Cakravastia A., Iskandar B.P.
The impact of fleet size on remanufactured product with usage-based maintenance contract(2018) - Husniah H., Pasaribu U.S., Iskandar B.P.
Two-dimensional lease contract model with coordination for new and used equipment(2018) - Husniah H., Pasaribu U.S., Iskandar B.P.
Warranty cost for remanufactured product considering lemon laws(2018) - Iskandar B.P., Cakravastia A., Husniah H.
New warranty policies for a remanufactured product(2017) - Husniah H., Supriatna A.K., Pasaribu U.S., Iskandar B.P.
Optimal number of fleet maintenance contract with policy limit cost(2017) - Optimal preventive maintenance for a two dimensional lease contract(2017)
- Dymasius A., Wangsaputra R., Iskandar B.P.
Analysis of Maintenance Service Contracts for Dump Trucks Used in Mining Industry with Simulation Ap(2016) - Husniah H., Cakravastia A., Iskandar B.P., Pasaribu U.S.
Modelling and analysis of maintenance contract with imperfect preventive maintenance(2016) - Husniah H., Iskandar B.P.
Modelling two-dimensional lease contract with preventive maintenance and servicing strategy(2016) - Iskandar B.P., Husniah H.
On the application of copula in modeling maintenance contract(2016) - Pakpahan E.K.A., Iskandar B.P.
Optimal maintenance service contract involving discrete preventive maintenance using principal agent(2016) - Husniah H., Pasaribu U.S., Iskandar B.P.
Optimal preventive maintenance for a fleet of dump trucks with two-dimensional lease contract(2016) - Pakpahan E.K.A., Iskandar B.P.
Performance based lease contract involving discrete preventive maintenance(2016) - Husniah H., Pasaribu U.S., Iskandar B.P.
Two dimensional maintenance contract with coordination between owner and agent(2016) - Husniah H., Supriatna A.K., Iskandar B.P.
Improving service contract management with availability and negotiation(2015) - Pakpahan E.K.A., Iskandar B.P.
Maintenance service contract model for heavy equipment in mining industry using principal agent theo(2015) - Iskandar B.P., Cakravastia A., Husniah H.
Optimal preventive maintenance for a two dimensional lease contract(2015) - Iskandar B.P., Cakravastia A., Pasaribu U.S., Husniah H.
Performance-based maintenance contract for a fleet of dump trucks used in mining industry(2015) - Husniah H., Pasaribu U.S., Iskandar B.P.
Service contract management with availability improvement and cost reduction(2015) - Maintenance service contracts for a fleet of dump trucks used in mining industry(2014)
- Iskandar B.P., Husniah H., Pasaribu U.S.
Maintenance service contracts for equipment sold with two dimensional warranties(2014) - Soemadi K., Iskandar B.P., Taroepratjeka H.
Optimal overhaul-replacement policies for a repairable machine sold with warranty(2014) - Husniah H., Pasaribu U.S., Cakravastia A., Iskandar B.P.
Performance-based maintenance contract for equipments used in mining industry(2014) - Husniah H., Pasaribu U.S., Cakravastia A., Iskandar B.P.
Two dimensional maintenance contracts for a fleet of dump trucks used in mining industry(2014) - Husniah H., Pasaribu U.S., Iskandar B.P.
A servicing strategy involving imperfect repair for two-dimensional warranties(2013) - Husniah H., Pasaribu U.S., Iskandar B.P.
A servicing strategy involving preventive maintenance and imperfect repair for two dimensional warra(2013) - Van Der Heijden M., Iskandar B.P.
Last time buy decisions for products sold under warranty(2013) - Optimization of fly ash and silica fume as materials subtitution for cement with ternary sistem C-A-(2013)
- Iskandar B.P., Pasaribu U.S., Husniah H.
Performanced based two maintenance contracts for equipment sold with two dimensional warranties(2013) - Nursanti E., Ma\'ruf A., Simatupang T., Iskandar B.P.
Cost and availability functions using imperfect maintenance policy for a serial system(2012) - Pasaribu U.S., Husniah H., Iskandar B.P.
Renewal process in two-dimensional repairable products(2012) - Makmoen M., Cakravastia A., Irianto D., Iskandar B.P.
Servicing strategy and preventive maintenance for products sold with one-dimensional warranties(2012) - Pasaribu U.S., Husniah H., Iskandar B.P.
Stochastic system in discrete preventive maintenance and service contract(2012) - Iskandar B.P., Jack N., Murthy D.N.P.
Two new servicing strategies for products sold with warranty(2012) - Husniah H., Pasaribu U.S., Halim A.H., Iskandar B.P.
A maintenance service contract for a warranted product(2011) - Iskandar B.P., Jack N.
Warranty servicing with imperfect repair for products sold with a two-dimensional warranty(2011) - Jack N., Iskandar B.P., Murthy D.N.P.
A repair-replace strategy based on usage rate for items sold with a two-dimensional warranty(2009) - Saraswati D., Cakravastia A., Iskandar B.P., Halim A.H.
Joint economic lot size model with quality improvement for a single supplier and a single buyer coop(2009) - Iskandar B.P., Murthy D.N.P., Jack N.
A new repair-replace strategy for items sold with a two-dimensional warranty(2005) - Jack N., Murthy D.N.P., Iskandar B.P., Chen T.-M., Popova E.
Comments on "maintenance policies with two-dimensional warranty"(2003) - Iskandar B.P., Murthy D.N.P.
Repair-Replace Strategies for Two-Dimensional Warranty Policies(2003) - Iskandar B.P., Sandoh H.
An extended opportunity-based age replacement policy(2000) - Iskandar B.P.
An opportunity-based age replacement policy considering warranty(1999) - Two-dimensional failure-free warranty policies: Two-dimensional point process models(1995)
- A simulation approach to analysis of free replacement policies(1992)
- A new shock damage model: Part I-Model formulation and analysis(1991)
- A new shock damage model: Part II-Optimal maintenance policies(1991)
- Reply by Murthy Iskandar(1991)
- Reply to vesely s comments on a new shock damage model: Part I-Model formulation and analysis (1991)
- Reply to vesely s comments on a new shock damage model: Part II-Optimal maintenance policies (1991)
-