Kelompok Keahlian | KK Sistem Manufaktur |
---|---|
Sekolah/Fakultas | Fakultas Teknologi Industri |
Jabatan Fungsional | ASISTEN AHLI |
- S1
ITB, Bandung – Indonesia
2010
- S2
ITB, Bandung – Indonesia
2013
- S3
Sophia University, Tokyo – Jepang
2020
- Google Scholar
- h-index : 5
- i10-index : 3
- Scopus
- h-index : 4
- Sinta
- SINTA Score Overall : 416
- SINTA Score 3 Years : 106
Solving a multi objective dual resource constrained scheduling for supporting social sustainability using NSGA II (2021)
- Usulan Sistem Penilaian Capaian Pembelajaran Mata Kuliah (CPMK) dalam Menunjang Penilaian Capaian Pembelajaran Lulusan (CPL) Program Studi
M Akbar, D IriantoProsiding Seminar Nasional Teknik Industri 1, 974-984 (2023)
- Usulan Sistem Penilaian Capaian Pembelajaran Mata Kuliah (CPMK) dalam Menunjang Penilaian Capaian Pembelajaran Lulusan (CPL) Program Studi
M Akbar, D IriantoProsiding Seminar Nasional Teknik Industri 1, 974-984 (2023)
- NSGA-II variants for solving a social-conscious dual resource-constrained scheduling problem
M Akbar, T Irohara
Expert Systems with Applications 162, 113754 (2020) - Metaheuristics for the multi-task simultaneous supervision dual resource-constrained scheduling problem
M Akbar, T Irohara
Engineering Applications of Artificial Intelligence 96, 104004 (2020) - Akbar M., Irohara T.
A DRC Scheduling for Social Sustainability: Trade-Off Between Tardiness and Workload Balance(2019) - A social-conscious scheduling model of dual resources constrained identical parallel machine to mini(2018)
- Trusaji W., Akbar M., Sukoyo, Irianto D.
Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction(2018) - Dual Resource Constrained Scheduling Considering Operator Working Modes and Moving in Identical Parallel Machines Using a Permutation-Based Genetic Algorithm(2018)
- Wijaya A.J., Trusaji W., Akbar M., Ma\'Ruf A., Irianto D.
Improving Quality of Shoe Soles Product using Six Sigma(2018) - Scheduling for sustainable manufacturing: A review(2018)
- Andriani G.P., Akbar M., Irianto D.
Dry Machining Process of Milling Machine using Axiomatic Green Methodology(2016) - Malik A.L., Akbar M., Irianto D.
Improving Quality of Seal Leak Test Product using Six Sigma(2016) - Akbar J., Akbar M., Irianto D.
Measurement and Development of Humanware and Technoware Competencies in Order to Meet Pintle Chain P(2016) - Govindaraju R., Akbar M., Gondodiwiryo L., Simatupang T.
The Application of a Decision - making Approach based on Fuzzy ANP and TOPSIS for Selecting a Strategic Supplier (2015)
-