Kelompok Keahlian | KK Sistem Manufaktur |
---|---|
Sekolah/Fakultas | Fakultas Teknologi Industri |
Jabatan Fungsional | LEKTOR |
- S1
ITB, Bandung – Indonesia
2002
- S2
ITB, Bandung – Indonesia
2006
- S3
Toyohashi University Of Technology, Toyohashi – Jepang
2015
- Google Scholar
- h-index : 5
- i10-index : 4
- Scopus
- h-index : 4
- Sinta
- SINTA Score Overall : 400
- SINTA Score 3 Years : 183
The 5th Asia Pacific Conference on Manufacturing Systems (2019)
- An Integrated Inventory and Order Pick-up Model Considering the Capacities of Vendors, the Limited Number of Vehicles, and the Duration of Vehicle Trips for the Multi-Vendor …
B Marpaung, W Aribowo, S Suprayogi, AH HalimProsiding Seminar Nasional Teknik Industri 1, 98-107 (2023)
- Best-Fit Heuristic Algorithm for Multi-stack Rectangular Packing Problem of NC Router Machine
I Ali, W Aribowo, SukoyoProceedings of the International Manufacturing Engineering Conference & TheAsia Pacific Conference on Manufacturing SystemsHalaman 509-516 (2022)
- Assembly Sequence Optimization to Minimize Reorientation and Tool Changes Using Genetic Algorithm
William, FM Hasby, W Aribowo, SukoyoProceedings of the International Manufacturing Engineering Conference & TheAsia Pacific Conference on Manufacturing Systems Halaman 51-57 (2022)
- Single Item Batch-scheduling Model for a Flow Shop with m Batch-processing Machines to Minimize Total Actual Flow Time
AH Halim, NPA Hidayat, W AribowoInternational Journal of Technology (2022)
- A single-stage batch scheduling model with m heterogeneous batch processors producing multiple items parts demanded at different due dates
NPA Hidayat, A Cakravastia, W Aribowo, AH HalimInternational Journal of Industrial and Systems Engineering 41 (2), 254-275 (2022)
- A Single Batch Processor Scheduling Model with Additional Setup Times to Minimize Total Actual Flowtime of Parts of Multiple Items
NPA Hidayat, W Aribowo, AH HalimJournal of Physics: Conference Series 1858 (1), 012019
- An optimization model of variable size two-dimensional nesting with stacked sheets and usable leftovers for the CNC routing process. Wisnu Aribowo, Irfansyah Ali,and Sukoyo (2021)
- An Integrated Inventory and Order Pickup Model in the MVSB System considering Capacities of Vendors. (2021)
- Capacity planning model for make-to-order companies considering lateness penalty cost based on critical resources
Aribowo, W., Hudzaifah, M.A., Halim, A.H.
Lecture Notes in Mechanical Engineeringthis link is disabled, 2020, pp. 320–325 (2020) - Scheduling an aircraft maintenance shop with dedicated technician and dedicated machine constraints
Aribowo, W., Prastomo, O.W., Halim, A.H.
Lecture Notes in Mechanical Engineeringthis link is disabled, 2020, pp. 260–265 (2020) - Six sigma implementation to reduce rejection rate in textile mills
Angelia, Trusaji, W., Aribowo, W., Irianto, D.
Lecture Notes in Mechanical Engineeringthis link is disabled, 2020, pp. 211–216 (2020) - Aribowo W., Yamashita T., Terashima K.
Integrated trajectory planning and sloshing suppression for three-dimensional motion of liquid conta(2015) - Cubic spline trajectory planning and vibration suppression of semiconductor wafer transfer robot arm(2014)
- An Implementation of cubic spline optimization with floating via points and vibration suppression fo(2013)
- Tracking control system for walking assist using intention estimation(2012)
- Vibration control of semiconductor wafer transfer robot by building an integrated tool of parameter (2011)
- Input shaping control to suppress sloshing on liquid container transfer using multi-joint robot arm(2010)
-