
| Kelompok Keahlian | KK Sistem Manufaktur |
|---|---|
| Sekolah/Fakultas | Fakultas Teknologi Industri |
| Jabatan Fungsional | LEKTOR KEPALA |
- S1
ITB, Bandung – Indonesia
1993
- S2
ITB, Bandung – Indonesia
1997
- S3
ITB, Bandung – Indonesia
2011
- Google Scholar
- h-index : 7
- i10-index : 5
- Scopus
- h-index : 6
- Sinta
- SINTA Score Overall : 493
- SINTA Score 3 Years : 138
- Penguatan Agroindustri Minyak Kelapa Berkelanjutan melalui Diversifikasi Produk dan Teknologi Tepat Guna Berbasis Kolaborasi Teknik Kimia–Teknik Industri di Kabupaten Majene (2026)
- Job Shop Scheduling Model to Tackle Serious Impact Dynamic Events Through Simulation Techniques (2025)
- MODEL INTEGRASI PENENTUAN TINGKAT PERSEDIAAN PADA SISTEM PRODUKSI BATCH YANG MEMPERTIMBANGKAN PENGIRIMAN UNTUK MEMINIMASI TOTAL BIAYA PERSEDIAAN DAN PENGIRIMAN (2024)
- Multi-Stack Rectangular Packing Problem of NC Router Machine (2023)
- Metaheuristik untuk Model Penjadwalan Dual Resource Constraint Multi-Objective yg Mempertimbangkan Dimensi Pembangunan Keberlanjutan (2023)
- Peningkatan Efisiensi Pertanian Jamur Pasca Gempa Cianjur (2023)
- Pengembangan Alat Bantu Jalan Untuk Anak Dengan Palsi Serebral Di Rumah Cinta Inklusi Dalam Rangka Mendukung Program Rehabilitasi Berbasis Masyarakat Di Jawa Barat (2022)
- Perancangan Sistem Penjadwalan dan Pengendalian Pergerakan Multi-Hoist Crane pada Line Surface Treatment (2022)
- Sistem Otomasi Proses Surface Treatment (2022)
- Penerapan Industry 4.0 Pada Pertanian Jamur (2022)
- Pengembangan proses dan alat timbang berbasis IoT bagi petani broiler pada masa panen dan pemeliharaan (2022)
- Model Integrasi Pengelolaan Limbah Dengan Jadwal Penanganannya (2022)
- Perancangan Usulan Perbaikan Kualitas Produk A Pada Pt Xyz Mengunnakan Metode Six Sigma (2020)
- Sistem Alat Bantu Pemrograman Lengan Robot Industri Menggunakan Metode Programming By Demonstration (2019)
- Perancangan Alat Bantu Perakitan Rangka Mobil Di Pt Mercedes Benz Indonesia (2018)
- Model Penjadwalan Batch Dan Penugasan Operator Untuk Meminimumkan Actual Flow Time Pada Sistem Produksi Flow Shop (2018)
- Pengembangan Sistem Perhitungan Biaya Kepemilikan Total Sebagai Pendukung Keputusan Pemilihan Bearing (2017)
- Seleksi Program Magister dan Doktor TMI (2012)
- Seleksi dan Matrikulasi untuk Program Studi Magister dan Doktor TMI-ITB Tahun Ajaran 2011/2012 (2011)
- Penyusunan Tataran Transportasi Lokal Kabupaten Bandung Tahun Anggaran 2008 (2008)
- Perencanaan Pembangunan Prasarana dan Fasilitas Perhubungan (2008)
- Penyusunan Tataran Transportasi Lokal Kabupaten Bandung Tahun Anggaran 2008 (2008)
- Perencanaan Pembangunan Prasarana dan Fasilitas Perhubungan (2008)
- Prediction of Injection Product Weight and Energy Consumption Based on Transfer Learning (2025)
- Development of Aircraft Part Heat Treatment Operation Scheduling Based on a Variable Neighborhood Search Algorithm (2025)
- Multi-Objective Optimization of Injection Parameters and Energy Consumption Based on ANN-Differential Evolution (2025)
- Assembly Sequence Optimization to Minimize Reorientation and Tool Changes Using Genetic Algorithm
William, Hasby, F.M., Aribowo, W., Sukoyo
Lecture Notes in Mechanical Engineering, 2023, pp. 51–57 (2023) - Best-Fit Heuristic Algorithm for Multi-stack Rectangular Packing Problem of NC Router Machine
Ali, I., Aribowo, W., Sukoyo
Lecture Notes in Mechanical Engineering, 2023, pp. 509–516 (2023) - A Batch Scheduling Model for a Three-Stage Flowshop with Batch Processor and Heterogeneous Job Processor to Minimize Total Actual Flowtime
Suryadhini, P.P., Sukoyo, Suprayogi, Halim, A.H.
Intelligent Engineering and Management for Industry 4.0, 2022, pp. 1–12 - W. Aribowo, I Ali, Sukoyo. "An optimization model of variable size two-dimensional nesting with stacked sheets and usable leftovers for the CNC routing process." Journal of Physics:Conference Series 1858 (1), 012043 (2021)
- Suryadhini, P.P., Sukoyo, S., Suprayogi, S., Halim, A.H. "A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time". (2021)
- An optimization model for coal procurement networks with coal blending facilities
Imaduddin, M., Sukoyo
Lecture Notes in Mechanical Engineeringthis link is disabled, 2020, pp. 326–334 (2020) - Normasari N.M.E., Yu V.F., Bachtiyar C., Sukoyo
A simulated annealing heuristic for the capacitated green vehicle routing problem(2019) - Yusriski R., Sukoyo, Samadhi T.M.A.A., Halim A.H.
An integer batch scheduling model considering learning, forgetting, and deterioration effects for a (2018) - Trusaji W., Akbar M., Sukoyo, Irianto D.
Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction(2018) - Siswanto J., Sukoyo, Razan A.
Business system requirement for small craft companies(2017) - Yusriski R., Sukoyo, Samadhi T.M.A.A., Halim A.H.
An Integer Batch Scheduling Model for a Single Machine with Simultaneous Learning and Deterioration (2016) - Yusriski R., Astuti B., Sukoyo, Samadhi T.M.A.A., Halim A.H.
Integer Batch Scheduling Problems for a Single-Machine to Minimize Total Actual Flow Time(2015) - Siswanto J., Suparman S., Sudirman I., Sukoyo, Andriani M.
Characteristics of business system requirement for creative industries SMEs in bandung(2014) - Kasmara A., Muraki M., Matsuoka S., Sukoyo, Suryadi K.
Production planning in remanufacturing/manufacturing production system(2001)
-